A shipment the 4th of oversized equipment (BreakBulk) for the PALU-3 Coal Steam Power Plant project
07/09/2023
Project Information
Shipment 4th data:
- Shipment data: Project: PALU-3 COAL-FIRED STEAM POWER PLANT
- Commodity: Part of Stacker Reclaimer
- Volume: 560 PKGS
- Gross Weight: 1,536,319 KGS/ 7,916 CBM
- Vessel capacity of 11,529 DWT
- POL: Masan, Korea
- POD: Pantoloan, Indonesia
A shipment the 4th of oversized equipment (BreakBulk) for the PALU-3 Coal Steam Power Plant project
Vantage Logistics surveyed the sea freight plan for the shipment of the 4th of oversized equipment and accessories (BreakBulk) for the PALU-3 coal-fired steam power plant project.


- Vantage’s scope: Sea transportation by Break Bulk from Masan to the destination port in Pantoloan, Indonesia.
- Shipment Time: 15th – 30th Apr, 2023




Solution Project Logistics
PLANNING, CONSULTANCY & ENGINEERING
- Feasibility & Route Surveys
- Transport Engineering
- Permits & Compliance
- Cost Optimization
CORE TRANSPORTATION & CHARTERING
- Vessel & Air Chartering
- Heavy-lift & OS/OW Transport
- Multimodal Solutions
- Port & Terminal Services
TECHNICAL HANDLING & SITE SERVICES
- Heavy Lifting
- Crane Rental
- Lashing & Securing
- Site Delivery
DOCUMENTATION, CUSTOMS & COMPLIANCE
- Specialized Clearance
- Tax Consulting
- HSE Compliance
- Risk Management
WAREHOUSING & INTEGRATED LOGISTICS
- Project Storage
- Consolidation
- Packing & Crating
- Inventory Control
MONITORING & ON-SITE SUPERVISION
- Specialized Task Force
- Technical Field Oversight
- Logistics & Escort Sync
- Reporting & Rapid Response
Contact Us
How can we help you today?