INDUSTRIAL

Industrial

VANTAGE COMPLETES TRANSPORTATION OF 160 TONS OF STEEL STRUCTURES FOR NEWAY VALVE VIETNAM FACTORY CONSTRUCTION PROJECT

Vantage Logistics has successfully completed the first shipment for the Neway Valve Vietnam Co., Ltd. factory construction project, transporting 160 tons of steel structures from Shanghai Port, China to Ho Chi Minh City, Vietnam. With a total cargo value of more than USD 150,000, the shipment required close coordination throughout the ocean transportation, import customs clearance, port handling, and final delivery processes. The schedule also had to be maintained during the Reunification Day and International Labor Day holidays. A Suitable Transportation Solution for Factory Construction Cargo The shipment consisted of steel structures for factory construction, including steel columns, steel frames, beams, and tie rods. The characteristics of the cargo required the transportation plan to consider handling, securing, and final delivery requirements from the outset. For this shipment, Vantage arranged breakbulk ocean transportation from Shanghai Port to Ho Chi Minh City Port, followed by import customs clearance, port handling, and final delivery to Dat Do Industrial Park. Based on the cargo characteristics and the customer’s schedule requirements, Vantage proposed a suitable transportation solution while optimizing costs by focusing on the necessary handling processes and avoiding unnecessary steps. Maintaining the Schedule During the Holiday Period Maintaining the schedule was one of the key requirements of the shipment, as the transportation took place during the holiday period. Vantage coordinated closely with the factory, agents, and port authorities to ensure continuous handling throughout each stage. Import customs clearance and port operations were closely monitored, while the delivery plan was prepared according to the receiving schedule at the project site. Close coordination among all parties helped minimize unnecessary delays and ensured the 160-ton shipment was completed safely and on schedule. On-Site Supervision for Safe Handling of Steel Structures Transporting steel structures for a factory construction project requires careful consideration of both the cargo characteristics and the actual conditions at the delivery site. Vantage’s technical and on-site supervision teams were present at the project site to monitor cargo handling and securing. Steel columns, frames, beams, and tie rods were carefully supervised during handling to ensure they were properly secured and transported safely. Continuous on-site supervision and communication among the parties helped maintain control of the process from port handling through final delivery to the project site. Project Cargo Transportation from Shanghai to Vietnam For this 160-ton steel structure shipment, Vantage managed the transportation process from Shanghai Port, China to the project site in Vietnam, covering breakbulk ocean transportation, import customs clearance, port handling, final delivery, and on-site supervision. The safe and timely completion of the first shipment provides a solid foundation for the following stages of the Neway Valve Vietnam Factory Construction Project. Throughout the operation, international transportation, customs procedures, port handling, and final delivery were coordinated as one process to maintain the schedule and meet the requirements of the project site. Vantage Logistics – Project Cargo Transportation From breakbulk ocean transportation, import customs clearance, and port handling to final delivery and on-site supervision, Vantage develops transportation solutions based on the actual requirements of each stage. For cargo supporting factory construction projects, cost, safety, and schedule remain key considerations when developing an effective transportation plan.   Contact Vantage Logistics for tailored transport solutions and competitive quotations. Please provide details on cargo type, market, origin, destination, and estimated timeline.   Vantage Logistics Corp – South East Asia (S.E.A) Logistics Provider One-Stop Shop For Integrated Logistics Services Head Office Viet Nam – Suite 6.01, Floor 6th, Block A, RiverGate Residence, 151-155 Ben Van Don, Khanh Hoi Ward, HCMC, Viet Nam Branch Thailand, Laos, Cambodia, Malaysia, Indonesia, Singapore Contact Us Email in**@*****om.vn Hotline +84-909-026-261 Website https://vantage-logistics.com   Send your shipment enquiry today and receive a tailored transport plan from the Vantage Logistics team.

08/10/2026

View More

Industrial

VANTAGE LOGISTICS HANDLES PROJECT CARGO FOR SANDOW LAKE ENERGY STATION – 1200MW POWER PLANT PROJECT

Behind every large-scale Power Plant Project are critical pieces of equipment, demanding technical requirements, and a transportation plan that needs to be carefully controlled at every stage. For Sandow Lake Energy Station, Vantage Logistics handled coordination and loading supervision for key project equipment, including High Pressure Steam Drum and Tanks, for a Natural gas power plant with a capacity of Power Plant 1200MW. One Coordination Hub – Connecting Multiple Parties For project cargo to move according to plan, close coordination between all parties is essential. Vantage Logistics actively connected with shippers, shipping agents, port authorities, foreign partners, and shipowners, while serving as the main hub for shipment updates. From cargo status and loading plans to vessel schedules, key information was continuously communicated and updated. Maintaining a consistent flow of information enabled the involved parties to respond quickly to changes and supported timely decision-making throughout the operation. Managing Vessel Schedules and Keeping the Project on Track In project cargo transportation, even a small change in vessel schedules can affect subsequent operations. Vantage Logistics therefore maintained close coordination with relevant parties to monitor vessel schedules and delivery timelines throughout the shipment. This proactive approach helped reduce delay risks and keep transportation activities aligned with the overall schedule of the Power Plant Project. 24/7 Hands-On Loading Attendance For heavy, out-of-gauge (OOG), and high-value equipment, loading requires continuous and hands-on supervision. Vantage Logistics conducted 24/7 loading attendance at the port, monitoring the entire loading process and coordinating closely with the involved parties to ensure safe cargo handling. Critical equipment such as High Pressure Steam Drum and Tanks was closely monitored during loading, with strict attention to the project’s technical specifications and handling requirements. Where Precision Makes a Difference Beyond simply monitoring the operation, Vantage Logistics implemented professional monitoring and coordination procedures throughout the loading process. Continuous supervision enabled potential issues to be identified and addressed promptly, while helping minimize the risk of cargo damage during loading operations. For project cargo, every piece of equipment is part of a much larger plan. Ensuring precision at each stage of coordination and supervision therefore plays an important role in keeping the cargo journey safe and on schedule. Supporting Energy Projects with Confidence Through the Sandow Lake Energy Station project, Vantage Logistics continues to demonstrate its capability in managing heavy, OOG, and high-value project cargo. From multi-party coordination and vessel schedule management to 24/7 loading attendance, each stage is carefully monitored to maintain safety, accuracy, and operational continuity throughout the transportation process.   Contact Vantage Logistics for tailored transport solutions and competitive quotations. Please provide details on cargo type, market, origin, destination, and estimated timeline.   Vantage Logistics Corp – South East Asia (S.E.A) Logistics Provider One-Stop Shop For Integrated Logistics Services Head Office Viet Nam – Suite 6.01, Floor 6th, Block A, RiverGate Residence, 151-155 Ben Van Don, Khanh Hoi Ward, HCMC, Viet Nam Branch Thailand, Laos, Cambodia, Malaysia, Indonesia, Singapore Contact Us Email in**@*****om.vn Hotline +84-909-026-261 Website https://vantage-logistics.com   Send your shipment enquiry today and receive a tailored transport plan from the Vantage Logistics team.

29/09/2026

View More
vlc-news-catbi-17092026

Industrial

VANTAGE LOGISTICS COMPLETES THE DELIVERY OF A $3.4 MILLION PASSENGER BOARDING BRIDGES SYSTEM AT CAT BI INTERNATIONAL AIRPORT

Transporting oversized and heavy aviation equipment into an active airport environment requires strict control over timing, transport planning, and on-site organization. This demand was clearly demonstrated through Vantage Logistics’ successful delivery of a complete Passenger Boarding Bridges (PBB) system, valued at USD 3.4 million, to Cat Bi International Airport.     Challenges from an Active Airport Operating Environment Vantage Logistics executed an end-to-end transport service from the port to the jobsite for the Passenger Boarding Bridges (PBB) system, totaling USD 3,400,000 in value, at Cat Bi International Airport (Hai Phong, Viet Nam). Beyond being a shipment of specialized, bulky, and high-value equipment, the greatest challenge of the project lay in the specific characteristics of the delivery location: Cat Bi International Airport is an active, continuously operating facility. All vehicle movements, handling, and installation activities had to strictly comply with aviation security standards while ensuring absolutely no impact or disruption to the shared flight schedules.     Operational and Site Coordination Solutions To ensure the USD 3.4 million shipment was delivered safely and on schedule, Vantage Logistics’ project expert team established a pragmatic handling process: Thorough Surveys and Nighttime Scheduling: The technical team conducted detailed site surveys, designed route plans, and proactively arranged nighttime transportation to avoid congestion while strictly adhering to the strict time windows limited within the airport area Customs Clearance and Transport Capacity Coordination: Promptly completed complex customs procedures for aviation equipment while mobilizing sufficient trucking capacity to maintain a continuous transportation tempo HSE and Cargo Safety Standards Control: The entire lifting, lashing, and moving process applied rigorous health, safety, and environment (HSE) standards, ensuring the absolute integrity of the high-end equipment from the port to the airport jobsite The successful completion of the project at Cat Bi International Airport further affirms Vantage Logistics’ practical execution capabilities for project cargo lines that demand strict technical standards and rigorous operational procedures at critical infrastructure. Explore more on-site image from the project:   Contact Vantage Logistics for tailored transport solutions and competitive quotations. Please provide details on cargo type, market, origin, destination, and estimated timeline. Vantage Logistics Corp – South East Asia (S.E.A) Logistics Provider One-Stop Shop For Integrated Logistics Services Head Office Viet Nam – Suite 6.01, Floor 6th, Block A, RiverGate Residence, 151-155 Ben Van Don, Khanh Hoi Ward, HCMC, Viet Nam Branch Thailand, Laos, Cambodia, Malaysia, Indonesia, Singapore Contact Us Email pr*****@*****om.vn Office Tel +84-28-36203611 Website https://vantage-logistics.com Send your shipment enquiry today and receive a tailored transport plan from the Vantage Logistics team.

18/09/2026

View More

Industrial

Successfully Transported a Shipment of Overweight Equipment to the Messer Viet Nam Factory – Long An Branch

Successfully Transported a Shipment of Overweight Equipment to the Messer Viet Nam Factory – Long An Branch Vantage Logistics Corp (VLC) has completed the heavy break bulk cargo transportation project for Messer Vietnam’s industrial gas production plant in Long An.  VLC faced substantial challenges regarding the weight and dimensions of the cargo. Vantage Logistics’s scope of work: VLC handled the entire process, including: Consulting on tax exemption procedures Customs clearance services Semi trailer registration services Transportation from the port of Ho Chi Minh City to the factory This project has special oversized and overweight packages that cannot be transported by road from the port. Vantage Logistics has developed a combined water-road transportation plan, swiftly reinforcing a temporary dock so that barges can dock day and night to meet the delivery schedule to the factory. The dock reinforcement not only requires high technical expertise but also demands close coordination among the teams to complete in the shortest time possible, helping to reduce some processes at the port and save port costs for the customer. Vantage team reinforced swiftly a temporary dock so that barges can dock day and night to meet the delivery schedule to the factory.   To meet the factory construction schedule, Vantage has accelerated the transportation process, to deliver more than 20 containers per day from the port to the factory. This not only ensures to the necessary materials for the construction process are supplied but also helps maintain the continuous work pace at the construction site. Base on the creativity and flexibility in the transportation plan, Vantage has made a significant contribution to the success of this project, ensuring that all shipments are delivered to the right place, on time and the most optimal cost. Project name: Messer Viet Nam Industrial Gas Production Factory – Long An Branch Commodity: Cold Box, Cooling System, Semi Trailer Volume:  – Break Bulk Cargo: 47 Packages / 823 Tons / 3942CBM – Including special oversized and overweight packages as follows: – Package: 32.5mL x 5.4mW x 4.3mH x 60 Tons – Package: 25.5mL x 5.2mW x 4.3mW x 65 Tons – Package: 13.7mL x 4.8mW x 4.3mH x 54 Tons – Package: 14mL x 4.5mW x 4.3mH x 63 Tons – Package: 32.7mL x 4.1mW x 4.4mH x 50 Tons – Package: 27mL x 4mW x 4.4mH x 53 Tons – And 11 specialized semi-trailers: 13mL x 2.5mW x 3.6mH x 14 Tons – Container: 90 containers 40ft Port of Discharge (POD): Ho Chi Minh Port, Viet Nam Time of Shipments (TOS): 06/2023 – 04/2024...

20/05/2024

View More

Industrial

Vantage Logistics Successfully Transported Heavy Rail Machinery for the Auckland Rail Programme Project from Laem Chabang Port, ThaiLand

Vantage Logistics Successfully Transported Heavy Rail Machinery for the Auckland Rail Programme Project from Laem Chabang Port, ThaiLand   Vantage Logistics’s scope of work: Hygiene of cargo (Railway equipment) meets New Zealand’s import standards. Inland transportation from the factory in Saraburi province, Thailand to Laem Chabang port, Thailand. International Freight shipping from Thailand to New Zealand Machinery (railroad equipment) is stored at a factory far from central Thailand. Hence, the work, including cargo assessment, hygiene, disinfection, and transportation, poses many difficulties and incurs additional costs. Hygiene standards for cargo imported into New Zealand are very stringent. However, Vantage has successfully overcome these challenges by ensuring compliance with all regulations through the use of appropriate chemicals and materials. As a result, cargo is imported successfully and on schedule. Although the shipment was urgent, Vantage Logistics organized the appropriate vessel schedule, always closely monitored the train schedule, and informed the parties regularly to ensure project progress was not affected. Project name: Auckland Rail Programme Business Case Commodity name: Rail Stabilization and Consolidation KSP2002 Machine Volume: 1 PKGS/ 16.790mL x 2.980mW x 4.110mH/ 205.641CBM/ 46,900.00KG Port of loading (POL): LAEM CHABANG PORT, THAILAND Port of Discharge (POD): AUCKLAND PORT, NEW ZEALAND Shipment time: 01 – 02/2024...

19/04/2024

View More

Industrial

Successfully transported oversized and overloaded Lifting Frame (BreakBulk) for GE Hsinta and Azulao BU52 projects from PTSC Quang Ngai Factory to Busan Port, Korea

Successfully transported oversized and overloaded Lifting Frame (BreakBulk) for GE Hsinta and Azulao BU52 projects from PTSC Quang Ngai Factory to Busan Port, Korea Vantage Logistics has proposed multiple transportation solutions for the project, not only assisting the client in selecting the most suitable option based on requirements but also ensuring efficiency time, and cost. Additionally, Vantage has provided sensible solutions, aiding the client in securing payment documentation with relevant parties while maintaining the safety of the cargo and meeting the delivery schedule at the designated location. Vantage has implemented a strategy of using container ships for Breakbulk cargo, optimizing the transportation process. This approach, not only minimizes risks but also enhances flexibility in managing and transporting special cargo. The success of this transportation demonstrates the professionalism of the Project Team in overcoming every challenge associated with transporting oversized and international cargo. We are committed to providing the optimal solution for every Project. Project name: GE Hsinta and Azulao BU52 Commodity: Lifting Frame: Main Beam and Spreader Beam Volume: 2 BBK Items + 01 x 20DC 26.2mL x 0.75mW x 2.15mH x 25.093tons 23.97mL x 0.75mW x 2.15 mH x 22.583tons. Port of loading (POL): Vung Tau Port, Viet Nam Port of Discharge (POD): Busan Port, Korea Delivery Address: Masan Port, Korea Shipment time: 20/11/2023 – 08/12/2023 Vantage’s scope of work: Lashing cargo Handling and transporting from the PTSC Quang Ngai Factory in Dung Quat, Quang Ngai to the SSIT Vung Tau Port, Viet Nam Sea Freight from SSIT Vung Tau Port, Viet Nam to Busan, Korea Transportation from Busan Port to Masan Port, Korea...

30/01/2024

View More
1 … 7 8 9 10 11 … 19

Solution Project Logistics

Contact Us

How can we help you today?